2025-12-18 19:56 UTC
@deprecated_ii@poa.st I'm reminded of this (only slightly exaggerated) issue I encountered supporting engineering designers:
"Why is my electrical substation drawing taking so long to load after I switched to using the vendor's element for all the screws?"
The screw:
Replies (0)
No replies.