@gunchleoc@mastodon.scot Yeah that make sense. But we need to backfill the floor first if not when it rains we won’t be able to do any work at the house even the roofing would be hard as we all see how the place use to get muddy and wet. This why I wants us to backfill the floor then we can do any work even in the rainy season. Would also fine the floor is up and won’t be muddy and flooded. We only have one work which’s stopping us from starts the roof which’s the roof cap after that is direct roofing.

Replies (1)

  • @Sbarry8520@mstdn.social 2026-05-16 14:51

    @gunchleoc@mastodon.scot There’s time before the rain will be heavy that’s august and September so backfill the floor with gravel now would really help us to keep the work even in the rainy season. When we starts bricks laying it was in the middle of rain everywhere was slippery and wet. Here’s a video you can see the water we have to place 1 by 12 woods to keeps the wheelbarrow running for the mixed cement sand and concrete. This why I wants us to backfill the floor so that we can keep the work going.

    Open ##2628494